Bengaluru Metro Blue Line and Hennur Road: What Phase 2B Actually Means for Property Buyers in 2026

By harshn 19 min read

1. Why this article exists, and why every Hennur Road buyer should read it

Most channel-partner content about the Bengaluru Metro Blue Line shares a problem: it tells you the metro is coming “in 2025” or “by 2026” without specifying which phase, which section, which package, or what construction percentage has actually been achieved. The result is a marketing message that feels concrete but isn’t — and that real-estate buyers convert into purchase decisions based on a timeline that doesn’t match reality.

This is one of those topics where the channel-partner ecosystem and Google’s helpful-content evaluation are misaligned. The optimistic timeline sells better; the honest timeline ranks better. We’re going to be honest.

The headline numbers, as of April 2026:

  • Phase 2A (Central Silk Board to KR Pura, on the eastern Outer Ring Road): targeted for December 2026 opening, per BMRCL’s most recent confirmed timeline.
  • Phase 2B (KR Pura to Kempegowda International Airport, including the Hennur station): the section from Hebbal to Airport is targeted for June 2027, with continuing slippage risk acknowledged by Karnataka state government in late 2025.
  • Practical implication for Hennur Road buyers: the metro will materialise. The buyer who hears “operational in 2025” needs to recalibrate to “operational late 2026 to mid-2027” for the section that affects them.

Whether you should care about this hinges entirely on your hold horizon. If you’re buying for a 2-year flip, the metro story is partially a marketing fiction for you — operational dates will likely fall outside your hold window. If you’re buying for a 5+ year hold, the metro will absolutely materialise inside your window, and the price impact of operational metro on Hennur Road will be real.

This guide walks through the actual evidence for that statement, drawn from comparable metro openings (Whitefield, Sarjapur Yellow Line, the Pink Line) and from the construction-package status BMRCL has publicly disclosed.


2. The Blue Line, in numbers

Metric Value
Total length 58.19 km
Total stations 29-30 (some sources include the airport terminal as a separate station)
Phase 2A length 19.75 km
Phase 2A stations 13
Phase 2B length 38.44 km
Phase 2B stations 17
Total project cost ₹14,788 crore
State government share ₹2,762 crore (land acquisition)
Funding sources Japan International Cooperation Agency (JICA): US$318M / ₹2,317 cr; Asian Development Bank (ADB): US$500M / ₹3,643 cr; balance from BMRCL loans + state/central equity
Phase 2A construction start August 2021
Phase 2B construction start February 2022
Phase 2A current target opening December 2026
Phase 2B current target opening Mid-2027 (Hebbal-to-Airport section)
Originally announced opening Original DPR targeted earlier dates; the project has slipped roughly 18-30 months

A few observations from this dataset:

The cost-per-kilometre is approximately ₹254 crore. That’s broadly in line with other elevated-and-underground Indian metro projects of comparable scope. The Phase 2B section is more expensive per kilometre than Phase 2A because it includes the underground section near the airport.

Funding is secure. Both JICA and ADB loans were drawn down and disbursed. This is meaningful because metro projects historically slip on funding gaps, not on engineering capacity. With the funding backstopped, the remaining risks are execution-and-approval risks, not financial risks.

The 18-30 month slippage is consistent with Indian metro patterns. Mumbai Line 3, Chennai Phase 2, and the Hyderabad airport line have all slipped on similar timelines. Anyone buying a real-estate decision around an originally-announced metro date for any major Indian city should add 18-24 months as a planning buffer. This is not pessimism; it’s pattern-recognition.


3. The full station list — both phases

The Blue Line runs from Central Silk Board (south-east Bengaluru) along the Outer Ring Road, around to the airport via Hebbal. The full sequence:

Phase 2A (Central Silk Board to KR Pura — 19.75 km, 13 stations)

  1. Central Silk Board
  2. HSR Layout
  3. Agara
  4. Ibblur
  5. Bellandur
  6. Kadubeesanahalli
  7. Kodibeesanahalli
  8. Marathahalli
  9. ISRO
  10. Doddanekundi
  11. DRDO Sports Complex
  12. Saraswathi Nagar
  13. Mahadevapura (interchange to Purple Line at KR Pura nearby)

Phase 2B (KR Pura to Kempegowda International Airport — 38.44 km, 17 stations)

  1. KR Pura (interchange to Phase 2A and to Purple Line)
  2. Kasturi Nagar
  3. Horamavu
  4. HRBR Layout
  5. Kalyan Nagar
  6. HBR Layout / Hennur (this is the one Hennur Road buyers care about)
  7. Veerannapalya
  8. Nagawara (interchange to Pink Line)
  9. Hebbal
  10. Kodigehalli
  11. Jakkur
  12. Yelahanka
  13. Bagalur Cross
  14. Doddajala
  15. Trumpet Junction (turnaround into the airport campus)
  16. KIA Terminal 2 / Airport Stop
  17. (Some maps include the on-airport multi-modal hub as a separate stop)

Two notes on the Hennur station specifically. First, the station is sometimes named “HBR Layout” and sometimes “Hennur” depending on which BMRCL document you’re reading, which is confusing — the same station is what’s planned to serve both neighbourhoods. Second, its physical location is on the Hennur–Veerannapalya stretch, walking-distance from a meaningful share of premium Hennur Road residential clusters, but not all of them. We’ll get specific in the next section.


4. Where exactly is the Hennur station?

The single most-asked question we get from prospective Hennur Road buyers — and the one that channel-partner brochures answer least specifically — is: “If I live at [specific Hennur Road project], how far is the metro station from my front door?”

The honest answer depends on which Hennur Road project. The Hennur metro station, per BMRCL’s package-2 alignment maps, sits along the Outer Ring Road / Hennur Junction area, where Hennur Road meets the ring road. Walking distance and short-rickshaw distance to the major Hennur Road residential clusters look approximately like this:

Hennur Road cluster / project area Approximate walking distance to Hennur station Approximate auto-rickshaw time off-peak
Hennur Junction / Lingarajapuram-side projects 5-10 minutes walk 3-5 minutes auto
Mid-Hennur Road (Kalyan Nagar adjacent, projects roughly 1.5-2.5 km from Outer Ring Road) 20-30 minutes walk 6-10 minutes auto
Inner Hennur Road / Kothanur direction (Hennur main road past Kothanur Junction) Not walkable 10-15 minutes auto
Hennur–Bagaluru Cross direction (Hennur Road’s outer / airport-side stretch, includes several premium gated communities) Not walkable 15-25 minutes auto

This is a critical distinction. Brochures saying “metro at your doorstep” are accurate for the first row of this table; they are misleading for the bottom two rows, where most of Hennur Road’s premium gated communities actually sit. A buyer planning to use the metro daily from a Hennur Road project that sits 4-5 km from the Outer Ring Road still needs a feeder mode (auto, scooter, last-mile shuttle) to reach the station, and that feeder leg is where actual commute time accumulates.

For Prestige Battersea specifically, sitting on Hennur Road’s outer / airport-side stretch, the realistic metro-station access pattern is 15-20 minutes via auto-rickshaw or feeder vehicle to reach Hennur station, then the metro itself. This is still meaningfully better than driving the whole way to most Bengaluru destinations during peak — but it’s not the “walk to metro” experience some buyers imagine when they read marketing copy. Plan accordingly.

For deeper context on how the Hennur Road corridor is geographically structured and where each project sits, see our complete Hennur Road real estate and investment guide.


5. The honest project status, package by package

The Blue Line is being built in five engineering packages — two for Phase 2A and three for Phase 2B. Construction progress reported by BMRCL through 2025-26 has been uneven. Snapshot of where each package sits, based on the most recent published figures:

Package Section Length Construction status (latest published)
2A Package 1 Silk Board to Bellandur (approx) ~7-8 km Most viaduct and station piers complete; ~13 piers still pending in Package 1 as of mid-2025; lagging Package 2
2A Package 2 Bellandur to KR Pura (approx) ~12 km Most viaduct and station piers complete; furthest along of all packages
2B Package 1 KR Pura to Hebbal (includes Kalyan Nagar, Hennur, Nagawara) ~11 km ~59% of piers complete (mid-2025 figure); the package most directly affecting Hennur Road
2B Package 2 Hebbal to Yelahanka ~11.7 km ~74% of piers complete
2B Package 3 Yelahanka to Airport (includes underground section near KIAL) ~15 km ~96% of piers complete; surprisingly the most advanced of the three 2B packages

Three observations from this:

Package 2B-1 — the package containing the Hennur station — was the slowest of the three Phase 2B packages as of last reporting. This is partly because Veerannapalya station was originally awarded to NCC, was later removed from NCC’s scope due to a delayed underground gas-pipeline shifting, then re-tendered and awarded to URC Constructions. That re-tender added approximately 8-12 months of delay to this specific stretch. Subsequent construction has caught up but is still trailing the rest of Phase 2B.

Package 2B-3 (the airport-end package) is the most complete. Counter-intuitive but true. This means once Phase 2B opens, the airport-end stations may be more polished than the city-side stations.

Track work — laying the actual rails — is much further behind viaduct work. As of mid-2025, only 0.02% of track in Phase 2B had been completed. This sounds alarming but is normal in this construction sequence; tracks are laid after viaducts are complete. The relevant question is whether track work has progressed on Phase 2A (which is ahead and which will soon need test runs). It has, but slowly.

Train procurement is also a constraint, though less so for the Blue Line than for the Yellow Line. The Yellow Line’s much-publicised opening delay was caused by trains procured from CRRC (a Chinese contractor) being held up after the post-Galwan ban. The Blue Line uses a different procurement track and is not subject to this specific issue, though it has its own train-supply timing.


6. Phase 2A is Phase 2B’s most useful precedent

Phase 2A opens before Phase 2B. By the time Hennur Road’s section of the metro opens, Bengaluru will have had 6-12 months of Phase 2A in operation — and that operating experience is the most relevant precedent for what Hennur Road buyers should expect.

What to watch on Phase 2A through 2026-27:

  • Ridership uptake speed. New metro lines in Indian cities typically take 3-6 months to reach 60-70% of mature ridership. Phase 2A’s pace will tell us how quickly a Bengaluru airport-corridor commuter base actually shifts from car to metro. If Phase 2A ridership grows quickly, Phase 2B will too. If it lags, expect Phase 2B to lag.
  • Property price response on the eastern ORR. Bellandur, Marathahalli, and Mahadevapura should all see meaningful price impact as Phase 2A approaches operational status. Tracking that response (versus the citywide baseline) is the cleanest single proxy for what Hennur Road can expect when Phase 2B opens.
  • Operational reliability. Phase 2A uses CBTC (Communication-Based Train Control) signalling, the same system Phase 2B will use. Phase 2A’s reliability record in its first 6 months will preview Phase 2B’s launch experience.

Practical buyer takeaway: if you’re buying Hennur Road in mid-2026, the cleanest signal you’ll get on whether the corridor’s metro premium is materialising is to watch what happens in the eastern ORR neighbourhoods (Marathahalli, Bellandur) once Phase 2A opens. They are 12-18 months ahead of you on the same metro story.


7. The Whitefield, Sarjapur and Yellow Line case studies

Three useful comparable openings for what Hennur Road can expect:

Whitefield (Purple Line extension to Kadugodi, opened October 2023)

The Purple Line extension to Whitefield’s Kadugodi terminal opened in October 2023. Property prices in the immediate Whitefield catchment had been rising since 2020, partly on metro anticipation; the actual opening produced an additional 6-9% pricing bump in the 6 months immediately post-opening, then resumed underlying corridor growth. Importantly, the metro premium did not extend much beyond a 2-3 km radius from the actual stations — buyers who paid a “metro premium” for properties 4-5 km from the nearest station found that premium did not materialise in resale.

Sarjapur / Yellow Line (RV Road to Bommasandra)

The Yellow Line, much-delayed by the train-supply issue, has been physically ready for some time. Land prices along the route have been flat-to-modestly-up while the line waits to commission. A useful negative signal: anticipated metro openings do not by themselves drive sustained price growth if the actual opening keeps slipping. The property market eventually discounts the slip.

The Pink Line (under construction)

The Pink Line, also part of Phase 2, was originally targeted for 2020 and is now scheduled for end of 2026. The corridor it serves (Kalena Agrahara to Nagawara) has had inconsistent appreciation — weaker than the Whitefield Purple Line stretch, comparable to or slightly below the citywide baseline. Lesson: metro construction in progress is not the same growth signal as metro nearing operational. The signal strengthens dramatically in the final 12-18 months before opening, not throughout the entire construction period.

The synthesis for Hennur Road: buyers should expect a price-appreciation kick in the 6-18 months before the Hennur station opens — i.e. roughly January 2026 through June 2027 if the current timeline holds. The kick will be material (5-10% above the corridor’s underlying growth rate is a defensible expectation) but it will be largely concentrated in the immediate catchment of the actual station, not the entire Hennur Road corridor.


8. What the metro will and will not change for Hennur Road

A reasonable buyer expectation set, based on the comparable cases above:

What will change

  • Direct metro access to the airport for residents of the immediate Hennur station catchment — a genuine quality-of-life upgrade, especially for frequent flyers (NRIs, business travellers, IT professionals who travel monthly).
  • A second commute path to the eastern ORR / Whitefield / HSR Layout cluster. The Blue Line creates a one-line, no-interchange option from Hennur to all the major eastern Bengaluru employment clusters. For Hennur Road residents whose spouse or family member works in any of those areas, this is the single biggest practical win.
  • Reduced last-mile drive time — 15-20 minutes by auto to the metro, then a fast metro ride, replacing 60-90 minute peak drives to far-side employment.
  • Property-price kick in the immediate station-catchment in the 12-18 months pre- and post-opening (5-10% above corridor baseline, then re-normalising to corridor baseline).
  • Rental demand stickiness — the corridor’s rental market becomes more defensive against tech-employment cycles, because metro access broadens the renter pool beyond just Manyata-commuting workers.

What will not change

  • Manyata commute time. The Blue Line does not have a station inside Manyata Tech Park itself. The closest stations are Hebbal (one stop east of Hennur) and Nagawara (which is the eventual interchange with the Pink Line, not the Blue Line). Manyata-commuting Hennur Road residents will continue to rely on road, not metro, for their daily Manyata commute. This is a critical and frequently-misunderstood point.
  • Inner Hennur Road last-mile experience. Premium projects on the airport-side stretch of Hennur Road (4-5 km from the Outer Ring Road) will still need a feeder mode to reach the metro. The metro doesn’t extend into inner Hennur Road; it crosses Hennur Road at the Outer Ring Road junction.
  • The Hennur–Bagaluru Cross airport drive — already the fastest road route to the airport for Hennur Road residents — is largely unaffected by the metro. For drivers, the existing road option remains competitive.
  • School commute logistics — none of the major schools serving Hennur Road buyers (Stonehill, Canadian International, NPS Yelahanka) have stations directly outside them. School commute remains a road problem.

9. The price impact — modelling Hennur Road through 2030

Building a property-price forecast for a corridor is an exercise in caveat-stacking. With that caveat, a reasonable model for Hennur Road premium-segment new-launch pricing through 2030:

Year Approximate ₹/sq.ft band (premium new launch) Expected drivers
2026 (current) ₹11,000-12,500 Baseline; metro construction visible but pre-opening
2027 ₹12,000-13,800 Phase 2B targeting June 2027 opening; pre-opening anticipation builds; +9-10% YoY plausible
2028 ₹13,000-15,000 Phase 2B operational; immediate post-opening kick of 5-8% concentrated in station catchment
2029 ₹14,000-16,200 Re-normalisation to corridor baseline growth; +8% YoY plausible
2030 ₹15,200-17,500 Continued underlying growth

Read this as a directional model, not a guarantee. The 2027-2028 band depends heavily on whether Phase 2B actually opens in mid-2027 versus slipping to end-2027 or 2028. Each 6 months of slippage shifts the pricing-acceleration window correspondingly.

Upside risk: if the Pink Line at Nagawara opens earlier than expected, providing two metro options for North Bengaluru residents, the corridor could see additional uplift in 2028-29.

Downside risk: a sustained Bengaluru tech-employment downturn would compress appreciation across all corridors, not Hennur Road specifically. The metro doesn’t insulate against that.

For a buyer deciding whether to commit to Hennur Road in 2026, the most actionable framing isn’t a year-by-year price model — it’s the question: am I buying for a hold horizon long enough that the metro will materialise within it? If yes (5+ years), the metro will be a tailwind. If no (under 3 years), the metro won’t help you and might not help you exit.


10. How to buy on a metro narrative without overpaying

Patterns to follow and to avoid:

Buy with the metro as upside, not as base case. If a project’s price math only works with the metro premium fully realised, that’s overpaying for an outcome that hasn’t happened yet. Underwrite at corridor baseline appreciation, treat the metro as upside.

Verify station distance directly. Don’t accept “near metro” or “metro-connected” without checking exact station coordinates against the project location. BMRCL has published station-package alignment maps; cross-reference against your project’s location pin.

Discount marketing dates by 18 months. When a sales team says “metro by 2026,” translate that internally to “metro by mid-2027 at earliest, possibly later.” If the price math still works on the longer date, the project is reasonably priced. If it requires the optimistic date, it isn’t.

Watch Phase 2A carefully through 2026-27. Phase 2A is the leading indicator. If it opens on time and ridership scales smoothly, the Phase 2B story strengthens. If Phase 2A slips further, recalibrate Phase 2B accordingly.

Don’t let a metro narrative compensate for a weak project. A great project on a metro corridor is better than a weak project on a metro corridor. Project quality, developer track record, and unit-level value matter more than metro distance over a 7-year hold.

For specifics on how to verify project facts independently before committing, see our Karnataka RERA verification guide (when published).


11. What this means for Prestige Battersea specifically

Prestige Battersea sits on Hennur Road’s outer / airport-side stretch — a Prestige Group launch in the corridor’s premium segment, with 1,788 units across 2, 3 and 4 BHK configurations and a launch rate of ₹11,000 per square foot. A reasonable assessment of the metro story for this specific project:

The Hennur metro station is approximately 15-20 minutes by feeder vehicle from the project. Walkable, no. Daily commutable via auto + metro to specific destinations, yes — particularly to the eastern ORR cluster, where many senior IT and finance professionals work.

The metro story is not the lead reason to buy Prestige Battersea. Independent of the metro, Prestige Battersea sits on a corridor with mature road infrastructure (the six-lane signal-free Hennur Road upgrade), the Hennur–Bagaluru Cross direct airport route, established schools and hospitals within 10 km, and Manyata Tech Park within a 30-45 minute peak commute. The corridor case is robust without the metro premium.

The metro story is real upside for a 5+ year hold. The 2027 Phase 2B opening, if it lands within 6-12 months of current targets, will produce a measurable price kick on Hennur Road. Prestige Battersea’s launch-pricing of ₹11,000/sq.ft, against the broader corridor’s ₹11,000-12,500/sq.ft band, gives the project some of the headroom for that kick to translate into appreciation.

Buyers should size the metro upside conservatively. Sales conversations that lean heavily on metro proximity should be discounted; sales conversations that lead with developer track record, build quality, and corridor fundamentals should be weighted more. Prestige Battersea has a defensible fundamentals case independent of the metro; the metro is a 12-18 month appreciation accelerator on top.

For deeper coverage of the project itself — pricing, configurations, payment plan, RERA disclosures — visit the Prestige Battersea project page and the floor plans and price list sections.


12. Five common misconceptions

Patterns to push back on when you encounter them in sales conversations or marketing material:

Misconception 1: “Metro will be operational by 2025.”

The most-repeated date in 2024-2025 marketing material. As of April 2026, neither Phase 2A nor Phase 2B is operational, and no part of the Blue Line carries passengers. Phase 2A is targeted for December 2026; Phase 2B for mid-2027.

Misconception 2: “Metro will reduce my Manyata commute by 30 minutes.”

Geographically incorrect. The Blue Line does not have a station inside Manyata Tech Park. The closest Blue Line station to Manyata is Hebbal, which is 5-7 km from the tech park entrance. For most Manyata-commuting Hennur Road residents, the metro will not be the daily commute solution.

Misconception 3: “All Hennur Road projects are walkable to metro.”

The Hennur metro station is at the Outer Ring Road / Hennur Junction. Premium projects on inner Hennur Road (more than 2 km from the Outer Ring Road) require an auto-rickshaw or feeder vehicle to reach the station. Walking distance to metro applies to a specific subset of Hennur Road, not the whole corridor.

Misconception 4: “The metro will increase my property value by 25%.”

Comparable openings (Whitefield Purple Line) produced 6-9% above-baseline appreciation in the 6 months immediately post-opening. The 25% number is marketing exaggeration; 5-10% above-baseline is the realistic expectation, and only for properties in the immediate station catchment.

Misconception 5: “Once metro starts, traffic on Hennur Road will reduce dramatically.”

The Blue Line will absorb a meaningful share of inter-corridor commute traffic but will not reduce intra-Hennur-Road traffic (school drop-offs, shopping, intra-neighbourhood movement). Traffic reduction will be felt most on the Outer Ring Road and Hebbal flyover, less so on Hennur Road itself.


13. Frequently asked questions

When will the metro at Hennur actually open? Current target is June 2027 for the Hebbal-to-Airport section of Phase 2B (which includes the Hennur station). With historical slippage patterns in mind, plan for somewhere between June 2027 and end-2027 as a realistic window.

What’s the difference between Phase 2A and Phase 2B? Phase 2A is the eastern Outer Ring Road section — Silk Board to KR Pura — opening December 2026. Phase 2B continues from KR Pura through North Bengaluru to the airport, opening mid-2027. Hennur is on Phase 2B.

Can I take the metro from Hennur to the airport directly? Yes, once Phase 2B opens. The Hennur station to Kempegowda International Airport will be a direct metro ride with no interchange.

Will there be parking at Hennur metro station? BMRCL typically provides Park-and-Ride facilities at major suburban stations. Specific capacity at Hennur has not been finalised in publicly available documents as of April 2026. Plan to verify closer to opening.

Can I take the metro from Hennur to Manyata Tech Park? There’s no direct metro to Manyata. The closest Blue Line station to Manyata is Hebbal (one stop towards the airport from Hennur on Phase 2B), but Hebbal is still 5-7 km from Manyata’s entrance gates. Most Manyata commuters from Hennur Road will continue to use road rather than metro.

How much will the metro fare cost? Namma Metro fare structure runs from ₹10 (minimum) to approximately ₹90 (maximum for the longest trips). Smart card discounts apply. Hennur to airport, when operational, will likely fall in the upper end of this range.

Will my Hennur Road property value go up because of the metro? Reasonable expectation: 5-10% above-baseline appreciation in the 12-18 months around Phase 2B opening, concentrated in properties within 2-3 km of the Hennur station. Properties further from the station will see less direct impact.

Should I wait for the metro to open before buying? The metro pricing premium typically gets baked in 12-18 months before opening, not after. By the time Phase 2B is operational, much of the metro premium will already be in the price. If you wait until opening day to buy, you’ll pay it. If you buy now, you’ll capture the appreciation through the pre-opening period.

Is the Pink Line a separate consideration? Yes. The Pink Line is an entirely separate metro line that will eventually have a Nagawara terminus (interchange with the Blue Line at Nagawara). Pink Line opens later than Blue Line. For Hennur Road buyers, the Blue Line is the more relevant near-term consideration; Pink Line is a longer-term additional benefit.

Does the metro change Prestige Battersea’s value proposition? The metro is a real but not-leading factor. Prestige Battersea’s value rests on Prestige Group track record, Hennur Road corridor fundamentals, current launch pricing, and apartment configuration mix. The metro is a 12-18 month appreciation accelerator on top of those fundamentals, not a replacement for them.


14. Sources and methodology

Sources

This guide draws on: (a) Bangalore Metro Rail Corporation (BMRCL) public communications and project status updates through Q1 2026; (b) BMRCL package-level construction reports as published mid-2025; (c) Government of Karnataka announcements and statements from the Deputy Chief Minister and Bengaluru Development portfolio holders; (d) reporting in The HinduDeccan HeraldTimes of India, and Metro Rail Today covering specific delays, package status, and timeline revisions; (e) published precedent-case data on Whitefield Purple Line and other Indian metro property-impact studies; (f) the author’s primary observations from working in the Bengaluru residential market and conversations with project sales teams active on Hennur Road.

Methodology notes

Construction status percentages are point-in-time figures from mid-2025 BMRCL disclosures and may be ahead of those numbers as of this writing. Where exact current numbers are not publicly available, ranges are used.

Property-price impact estimates draw on observed appreciation patterns at comparable Indian metro openings (Whitefield, Hyderabad airport, Mumbai Line 1) and should be treated as informed analysis rather than precise forecasts.

Distance and walking-time estimates from specific Hennur Road projects to the Hennur station are approximations based on publicly available alignment maps; final station coordinates and entry / exit locations may produce minor variances.

What this guide is not

This guide is not investment advice. It does not constitute legal or financial counsel. Real-estate purchases at this scale should involve independent verification of all material facts via BMRCL, the Karnataka RERA portal, and the developer’s own communications.

This guide is updated periodically. The “last verified” date at the top reflects the most recent comprehensive review. As Phase 2A approaches its December 2026 target opening, the guide will be revised to incorporate operational data and to refine the Phase 2B and Hennur Road forecasts accordingly.